The Phase 3 tower at Pier 27 is visibly beginning to rise above grade with forming and concrete work underway on the ground floor, mezzanine and second levels.

Today and this week construction crews at the Phase 3 tower will be pouring concrete in the following areas:

  • South mezzanine level
  • Ground floor level
  • Walls and columns from the ground floor to the second level