Form the 13th through the 16th of February concrete work continues on the ground floor, mezzanine and second levels.
Construction crews at the Phase 3 tower will be pouring concrete in the following areas:
- South mezzanine level
- Ground floor level
- Second Level
- Walls and columns from the ground floor to the second level