Form the 13th through the 16th of February concrete work continues on the ground floor, mezzanine and second levels.

Construction crews at the Phase 3 tower will be pouring concrete in the following areas:

  • South mezzanine level
  • Ground floor level
  • Second Level
  • Walls and columns from the ground floor to the second level