This week the focus of work on the Phase 3 tower continues to be concrete pours and related work on the ground floor, mezzanine and 2nd floor levels:
- Ground floor slab
- Ground floor vertical columns to the 2nd floor
- Mezzanine vertical columns to the 2nd floor
- Second floor slab
- Second floor columns to the 3rd floor.