This week the focus of work on the Phase 3 tower continues to be concrete pours and related work on the ground floor, mezzanine and 2nd floor levels:

  • Ground floor slab
  • Ground floor vertical columns to the 2nd floor
  • Mezzanine vertical columns to the 2nd floor
  • Second floor slab
  • Second floor columns to the 3rd floor.