29 Queens Quay garage work

Mayfair Electric will be commencing work this week, April 16th – 20th , in the P1 garage at the North East corner, adjacent the area pictured on the right.

This work will be focused on:

  • Installing conduit in P1 at North face wall
  • Installing conduit at ramp wall
  • Installing pull box at ramp wall

There will be traffic control in place during work in high traffic areas.


IMG_20180415_170526_387
IMG_20180415_153857_733
IMG_20180415_153701_942

Phase 3 Construction

The main focus of work on the Phase 3 tower this week will be ongoing concrete pours on levels 3, 4, and 5.

Slab pours and vertical column pours will occur throughout the week.