29 Queens Quay garage work
Mayfair Electric will be commencing work this week, April 16th – 20th , in the P1 garage at the North East corner, adjacent the area pictured on the right.
This work will be focused on:
- Installing conduit in P1 at North face wall
- Installing conduit at ramp wall
- Installing pull box at ramp wall
There will be traffic control in place during work in high traffic areas.
Phase 3 Construction
The main focus of work on the Phase 3 tower this week will be ongoing concrete pours on levels 3, 4, and 5.
Slab pours and vertical column pours will occur throughout the week.
We will post updates if there is additional work of note.