by admin | Aug 31, 2018 | Uncategorized
Pier 27 Phase 3 There will be work on-site this Saturday, September 1 from 9:00 am to 4:00 pm. Crews will be on-site Saturday:Grinding ceilingsInstalling windowsRemoving debris from the parking garageThere will be no work on Labour Day, Monday September 3. Work...
by admin | Aug 27, 2018 | Uncategorized
Phase 3 Tower The installation of the hoist — the external construction elevator — continues this week on the east side of the tower. P1, P2, P3 & P4 LevelsInstalling block wallsHVAC installationGround FloorInstall Plumbing / Heating2nd FloorLayout of corridor and...
by admin | Aug 24, 2018 | Uncategorized
Saturday work at Pier 27 Phase 3 As we noted in our weekly overview, there will be work on the Phase 3 Tower this Saturday, August 25. Crews will b eon site working on:Painting underside of balcony slabs.Parging/grinding concrete.Crews will be on-site between 9 am and...
by admin | Aug 20, 2018 | Uncategorized
Phase 3 Tower The installation of the hoist — the external construction elevator — continues this week on the east side of the tower. 2nd and 3rd FloorsInstalling windows on the second and third floors through the week. 12th FloorSlab concrete pours to be complete...
by admin | Aug 13, 2018 | Uncategorized
Phase 3 Tower The hoist — the external construction elevator — will continue being installed throughout this week, on the east side of the tower. Also this week, concrete pours continue on the 12th floor of the Phase Three tower this week. Windows will begin being...