Work on-site from 9 am
There will be work on site today from 9 am though the afternoon. Including;
- Window installation
- Grinding concrete
- Drywall and framing on the 2nd floor.
Our overview of construction for the week of November 19 – 24, will be posted by or before 7 am Monday, November 19.