Work on-site from 9 am

IMG_20181116_161252_275
IMG_20181116_161417_504

There will be work on site today from 9 am though the afternoon. Including;

  • Window installation
  • Grinding concrete
  • Drywall and framing on the 2nd floor.

Our overview of construction for the week of November 19 – 24, will be posted by or before 7 am Monday, November 19.