Work on-site from 9 am at Phase 3
There will work on-site at Phase 3 this Saturday from 9 am onwards.
Work will occur on the exterior of the building, including:
- Railing installation
- Window installation
Interior work will focus on:
- Framing
- Levelling floors
- Drywall installation.
Our construction overview for next week will be posted by or before 7 am, Monday, February 11.