Construction Update, September 20, 2019

Construction Update, September 20, 2019

Phase 3 Interior work is progressing steadily throughout the podium and tower with drywalling, plumbing, kitchen and bathroom installation. Drywall is being installed up to the 23rd floor. Suites are being framed on the 34th floor. Suites are substantially finished...